Case Study: Radascan Emergency Troubleshooting in the Middle East

When a major client in the Middle East faced a critical failure of its Radascan system, Sinor Marine Services responded with a fast, structured process combining remote diagnostics, OEM-level expertise and immediate mobilization, to minimise vessel downtime and commercial impact.

Incident timeline

  • 14:00: Failure of the Radascan reported by the client
  • 14:05: The SMS technical team connected with the vessel and collected alarms and system status
  • 14:10: Case escalated to the SMS General Manager, a Guidance Marine-trained engineer (2011) with extensive experience on Cyscan and Radascan View. A likely hardware fault was identified on the Radascan sensor
  • 15:00: Vessel confirmed off-hire and returning to port. SMS committed engineer attendance with the required spares
  • 15:30: Critical spare parts for the sensor arranged and dispatched with a service engineer
  • 22:00: Vessel alongside. SMS engineer boarded immediately
  • 24:00: Faulty hardware replaced inside the sensor, system tested and Radascan restored

Result

Full operational recovery within 10 hours. The vessel returned to on-hire with minimal downtime.

Key success factors

  • Immediate technical response (within 5 minutes)
  • Accurate remote diagnosis by an OEM-trained engineer
  • Readily available critical spares
  • Efficient logistics and mobilization
  • Same-day onboard intervention
  • Reduced commercial loss for the client

For mission-critical DP and position reference systems, downtime is far more expensive than hardware replacement. The difference lies in correct diagnosis and speed of execution.